Design
- Structural integrity of our products
- Fire resistance of materials within each structure
- British & EU Standards conformity of all components
- Ergonomic considerations for internal layout
- Fire detection and alarm system integration and maintenance
- Safe storage and use of water
- Ventilation
Installation
- Working overseas: political conflict / diseases and required immunisations / weather concerns
- Lone working considerations
- Transportation of products
- Security of products
- M&E Systems set up, testing, commissioning, sign off
- Foundation suitability: a client concern which must be approved pre installation
User Safety
- Pre-use checks of all products following transportation and installation followed by sign off: internal and external aspects
- Ventilation
- Risk of fire: systems operational and maintained
- Structural integrity: installation at each location and construction
- Fire detection and alarm system integration and maintenance
- Restricted access or manipulation of all M&E systems: all systems closed off to unauthorised access
- Ventilation