PROJECT: SE8

GHG Energy provided consultancy, design and full project delivery for the installation of a PV System at Ashmead Primary School  as part of a community initiative in conjunction with Lewisham Council.

Technical Data

Location
South East London
System Size
50 kWp
PV Panel
Trina
Inverter
SMA
Mounting System
K2
Annual Output
41,000 kWh
Annual CO2 Savings
22,000 kg